Summary of October 8, 2026 CAD Review Under review: Foundation 1, Iteration 37 Objectives: Validate key dimensions on injector assembly Validate tolerances on injector assembly Validate machined throat and combustion chamber Perform risk analysis on engine assembly Classifications for mechanical evaluation: GREAT = Low risk of part failure GOOD = Low-moderate risk of part failure ACCEPTABLE = Moderate risk of part failure, lowest acceptable level of risk UNACCEPTABLE = High risk of part failure, cannot be flown BAD = Very high risk of part failure, cannot be flown 1: Validating key injector assembly dimensions Fuel injection shim holes diameter: GREAT Fuel injection shim thickness: GREAT Film cooling injection shim hole diameter: ACCEPTABLE Segmented pintle segmented length: GREAT Segmented pintle segmented width: GREAT Fuel injection plenums dimensions: GOOD Pintle plenum dimensions: GREAT 2: Validating tolerances on injector assembly: Fuel injection shim fuel hole tolerances: GOOD Fuel injection shim film cooling hole tolerances: ACCEPTABLE Fuel injection plate outer tolerances: GREAT Segmented pintle segment tolerances: GOOD Pintle tolerances to sliding section: ACCEPTABLE Pintle tolerances to plenum inner wall: BAD 3: Validate machined throat and combustion chamber: Throat dimension: GOOD * What I have documented is [REDACTED], but machined parts measure to be [REDACTED], which is actually mathematically correct. Chamber length: BAD * Expected to be [REDACTED], so we are [REDACTED] mm short Chamber width: ACCEPTABLE * Can be helped with changing length Nozzle length: GOOD Nozzle angle: ACCEPTABLE 4: Risk analysis: Key injector dimensions overall risk: LOW Injector tolerance overall risk: HIGH Mchined throat and combustion chamber risk: VERY HIGH OVERALL VERDICT: REDESIGN NECCESSARY